MANDATE

 

VISION  

A well-equipped Municipal Engineering Office that provides infrastructure supports for a more progressive and developed community and alleviate the quality of life of its constituents.

MISSION

The Engineering Office shall provide improved and sustainable infrastructure through the speedy and timely preparation of quality plans, specifications and programs of works that ensure effective, efficient and economical implementation of projects including the maintenance of roads and bridges and public works adhering to government standards.

THE STAFF

 

ENGR. ANTONIO A. VALDEZ Municipal Engineer  
ENGR. BRYAN N. TOLENTINO Engineer III  
ENGR. JEFFREY POLICINA Engineer II  
ENGR. LARA MAE A. BAYLON Engineer I  
JONATHAN JAMES T. CASTILLO Engineering Aide  
NOLASCO MALIJAN Engineering Aide  
MONICA ALEXIS R. ANDES Administrative Aide III  
FERDINAND M. ANDAYA Administrative Aide III  
JESUS S. CABATIC Utility Worker  

CITIZENS CHARTER

ISSUANCE OF BUILDING PERMIT

The Service:

A Building permit is required prior to construction, alteration, major repair, or renovation or conversion of any building/structure owned by the government or private entities.

The permit becomes null and void if work does not commence within 1 year from the date of such permit or work is suspended or abandoned at any time after it has been commenced for a period of 120 days.

PLEASE FOLLOW THESE STEPS

YOU WILL NEED TO PRESENT/PAY

IT WILL TAKE YOU

PLEASE APPROACH

1.   Sign client logbook/secure application forms and checklist of requirements

Available forms:

a. Application for BuildingPermit.

b. Architectural Permit

c. Civil Structural Permit

d. Sanitary Permit

e. Plumbing Permit

f. Electrical Permit

g. Mechanical Permit

h. Electronics Permit

i. Sidewalk development

Permit.

j. Fencing Permit

k. Sign Permit

l. Demolition Permit

 

 

3 minutes

JONATHAN T. CASTILLO

Engineering Aide

 

ENGR. BRYAN N. TOLENTINO

Engineer III

 

ENGR. ANTONIO A. VALDEZ

Municipal Engineer

 

 

 

 

 

 

 

To be secured from the Office of the Zoning Administrator.

2.  Submit application form and requirements for verification by Engineers concerned

 

   

a.  5 sets Building Plans-duly signed and sealed by Architect/ Engineer which include the following:

 

1. Architectural Plans

2. Structural Plans

3. Electrical Plans

4. Sanitary Plans

5. Plumbing plans

6. Mechanical Plans

7. Electronics plans

8. Sidewalk development permit

b.  5 sets of duly filled up and notarized application forms

c.  5 sets -Bill of materials

d.  5 sets-  Specifications

e. 2 sets – Design Analysis

f. 2 sets -Boring Test Report/ Plate load test ( 3 storey above)

g. Certified True Xerox coy of OCT/TCT

h. Tax Declaration

i.   Latest Real Property Tax Receipt

j.   Brown envelop

k.  Zoning decision

15  minutes

JONATHAN T. CASTILLO

Engineering Aide

 

ENGR. BRYAN N. TOLENTINO

Engineer III

 

ENGR. ANTONIO A. VALDEZ

Municipal Engineer

 

 

 

 

 

 

 

 

 

 

 

 

 

To be secured from the Office of the Zoning Administrator.

3.  Get Order of Payment (one day after date of submission)

 

3 minutes

JONATHAN T. CASTILLO
Engineering Aide

4.  Pay Building Permit Fee and others fees at the Mun. Treasurer’s Office

Order of payment

(Fees depend on the rates stated in the Revenue Code and the National Building Code)

10 minutes

Any available Collection Officer

5.  Get first endorsement

Official Receipt

3 minutes

JONATHAN T. CASTILLO
Engineering Aide

6.  Get Building Permit (5 days after payments)

– Official Receipt

– Second Endorsement from BFP

– Authority to withdraw permit if not the applicant owner

3 minutes

JONATHAN T. CASTILLO
Engineering Aide

ENGR. ANTONIO A. VALDEZ
Municipal Engineer

 ENGR. BRYAN TOLENTINO
Engineer III

OFFICE DIRECTORY
321-2634

 

PROGRAMS AND PROJECTS

 

ACCOMPLISHMENT REPORT

 

GALLERY

 

DOWNLOADABLE FORMS